|
|
Lianglu industrial development zone administration committee of Chongqing is situated in YUBEI district that one of main city proper. It’s One of Chongqing municipal characteristic industrial parks. Plan area is 35 square kilometers. Synthesized forms the textile clothing, Modern physical distribution, Biological drugs manufacture, Machine manufacture for core industrial groups. Choiring content highly technology, economic efficiency is good, the resource of energy consumption is low, the industrial project of environmental pollution few moves into the campus. By the superior environment and the high quality service, construct into the campus the industry high degree of concentration, the economical high speed development, the society highly civilized three high campus, realizes the human and the society, the human and the environment of our campus accord development diligently. |
Organization function responsibility of Lianglu industrial development zone administration committee of Chongqing
Office
It’s responsible for the campus management meeting current management work, handles the National People’s Congress bill, the politics to discuss the proposal responsibly.
TEL: 023-67827493
Treasury
It’s establishment campus’s construction funds plan, is coordinated and dispatches each kind of fund, the development financing channel, the guarantee development construction need.
TEL: 023-67827509
Copyright
- It’s responsible to invite businessmen to open company the material preparation, the manufacture, the project packing, the contract making and the foreign propaganda work.
- It’s responsible for the project, the fund, technical, in talented person’s introduction and the introduction discussion, the inspection work according to the plan.
TEL: 023-67810550? 023-67455229
Enterprise Service
- It’s responsible for the campus land utilization plan adjustment, the project construction land take over for use, sell, transfers and so on national territory procedure undertakings to request authorization as well as the land funds receiving after dunning work.
- The assistance handles enterprises to set up a file, the environmental protection in the development construction, the industry and commerce, the plan to request authorization, the construction and so on related procedure, help enterprises to solve in the production, the construction difficulty, provides the high-quality service for the project construction.
- It’s responsible for the campus statistical work. Grasps the enterprise to produce, the state of operation, completes has gone into production the enterprise each economic indicator statistical work.
TEL: 023-67136269? 023-67452606
Planning Office
- It’s responsible to establish the campus the overall plan, guarantees according to the control detailed gauge implementation campus construction.
- moves into the project construction implementation plan, the progress, the strategy and the measure to the campus industry carries on the science plan, according to campus plan, organization significant construction project plan establishment, proof.
- Assists manufacture each kind of publicity material.
TEL: 023-67804152? 023-67801566
Construction Office
- Handles the preliminary procedure construct the project of the campus.
- It’s responsible to implement campus infrastructure and soon cubic meter of earth and stone even base, path and water, electricity, gas, pipe network constructions and the maintenance work.
- It’s responsible for in the campus afforest, street light, Trash, public toilet facility constructions and soon.
- It’s responsible for Urbanization room, Standard workshop, Engineering constructions and soon.
- Help enterprises to handle the water, the electricity, the gas supply procedure, and provides uses electricity temporarily, the water used joining service.
- It’s responsible for infrastructural facilities aspect carry-over work of south area.
TEL: 023-67136236? 023-67136239
Project supervision and management office
- It’s responsible for the campus project management by supervision, the move of bid management.
- It’s responsible to establish, the examination campus project pre-, the settlement and has been completed the engineering data collection to the campus, the statistics, the management, the filing-up and the reassignment.
- It’s responsible to organize the campus key project the joint hearing and sends for approval the work.
TEL: 023-67814552
Relocation of settlements
- According to campus development project, Completes the related land policy responsibly the propaganda explanation work and the mass work, The implementation occupying land area urbanization personnel mobilize, the placement, the compensation work, the guarantee construction land need.
- The establishment urbanization personnel information net work, the support and the help urbanization personnel re-employment.
- Completes the original south area land-levying urbanization carry-over question handle work.
TEL: 023-67136209? 023-67136968
Safety and stability office
- Responsible for the safety in production, Social order, Legal system, Inquiry stable, keep the order of life and producing in the park.
- Responsible for the Safety and security, built and keep the fire, Stealing and exploding protection.
- Responsible for the prevention and management of the populace inquiry, Handles the thunderbolt, Assists to solve and manage carry-over question.
- Responsible for the Safe supervision of constructed and constructing project, Prevention and handle safety incident.
TEL: 023-67811793? 023-67813888
CHONGQING MUNICIPAL FACILITIES MAINTENANCE OF THE Fin Ltd
- Completes the municipal administration which constructs and completes constructing city has not turned over male to construct the facility maintenance management and the environmental sanitation, the a forestation and so on related supervisory work.
- It’s responsible for in the campus the public service advertizing establishment and the issue first trial work.
- It’s responsible for the South area infrastructure maintenance aspect leave behind the work.
TEL: 023-67815740
|
Superior geographical superiority
Campus depending on Chongqing north of the Changjiang River international airport, East near the Yufeng forest park, West sides north close neighbor Chongqing newly developed area Chang An Ford automobile city, South sides close neighbor Chongqing the newly developed area the special area for processing export products, With southwest biggest train station Longtousi train station, Yangtze River upstream biggest deepwater port inch beach port wharf straight distance less than 3 kilometers. The federal highway 319, Chongqing neighbors high speed road, the airport high speed road, the Chongqing bosom railroad, Jinkai main road and already the operation construction Chongqing intermediate belt high speed road, light rail 3 and 9 penetrations it.

|
Three-dimensional transport network
The harbor, the highway, the railway network, the airport aviation form the three-dimensional transport, provides the inexpensive physical distribution cost for the campus enterprise.
Railroad: Yuhuai railroad penetration the campus, Longtousi train station that the southwest biggest train station has been completed and puts the operation, Its completion, will form eight railway stations, radiates the land.
Road: the airport high speed road, Chongqing neighbors high speed road, Already operation construction Chongqing intermediate ring road penetration in it, With federal highway 210, 319, the Chongqing fu high speed road has composed the highway traffic net work which the campus extends in all directions.
Airport: There is Jiangbei international airport of Chongqing that year passenger capacity reaches 10,000,000 people, it’s only needs 5 minutes from the campus to there.
Waterway: The campus is apart from the Yangtze River upstream only inland river deepwater port inch beach port 3 kilometers, The 10 thousand-ton ships can reach directly, The volume of goods handled achieves 700,000 standard containers,. Rolls install automobile 150,000.
Light rail: constructing No.3 and No.9 of Chongqing light rail penetration campus, spanning north and south.

|

Consummation synthesis conveyance system
The campus infrastructure has realized the path, the electricity, the gas, to give the water, draining water, the pollution discharge, the communication, the close up, the network platform, the land leveling and so on, provides the effective safeguards to the production project in campus.

|
|